Syed faizan hussain

Syed faizan hussain DEFAULT

Jammu & Kashmir Dispute


Syed Faizan Hussain as the winner of The Queen's Young Leaders Award

London:  The Queen's Young Leaders Programme has announced Syed Faizan Hussain as the winner of The Queen's Young Leaders Award. He is one of the 60 young people from across the Commonwealth.

This year, Award winners are leading projects tackling global issues including education, climate change, gender equality, mental health and disability equality. Syed Faizan Hussain, 22 years old from Karachi, has been chosen in recognition of his use of technology to create solutions to health problems in his community.

Syed Faizan Hussain said, “I am delighted to have received this Award and look forward to expanding my leadership skills and engaging with people from various fields who will be sharing their ideas and experiences.”

The Queen's Young Leaders Awards recognise and celebrate exceptional young people aged 18 to 29 in the Commonwealth who are driving change within their communities and transforming people's lives. Now in its third and penultimate year, the 60 young people announced today become part of the growing Queen's Young Leaders community, a unique network of influential young change-makers who are coming together and being supported to become an even greater force for good. They will receive their Award from Her Majesty The Queen at a ceremony in London next year.

The Queen's Young Leaders Programme was established in 2014 by The Queen Elizabeth Diamond Jubilee Trust in partnership with Comic Relief, The Royal Commonwealth Society and the University of Cambridge's Institute of Continuing Education, in recognition of The Queen's lifetime of service to the Commonwealth. Each year for four years, 60 Queen's Young Leaders receive bespoke training, mentoring and networking opportunities, and take part in a week-long residential programme in London, to empower them to build on the work they are leading in their communities which is changing the lives of others for the better.

Dr Astrid Bonfield CBE, Chief Executive of The Queen Elizabeth Diamond Jubilee Trust said:

“We are delighted that these incredible young people have been selected as Queen's Young Leaders, and wish our warmest congratulations to each and every one of them. TheQueen's Young Leaders Award is designed to inspire and nurture the talent of exceptional young people from all over the Commonwealth, so that they can create and lead others towards securing positive changes in communities. The work being undertaken by the latest cohort of Queen's Young Leaders is addressing some of the most crucial issues facing the Commonwealth today. We cannot wait to see how their impressive endeavours grow and develop over the course of the year to come and beyond.”

To see a full list of Award winners and Highly Commended runners up, and read more about theirstories please visit www.queensyoungleaders.com.

December 02, 2016

Last updated: December 02, 2016

Sours: https://www.phclondon.org/infodiv/pressreleases/20161202_syed_faizan_hussain_receive_special_award_from_the_queen.aspx

syed faizan hussain

June 2015To Present

Design Manager & Senior Mechanical Engineer

I found this job using Bayt.com

atSASEL ELECTRO MECHANICAL COMPANY (FEMCO & YUKSEL HOLDING COMPANY)

Location :Saudi Arabia - Altaif

DUTIES AND RESPONSIBILITIES:
Design & Engineering duties and responsibility
 Preparing the concept design based on the project specification & international standards
(ASTM, ASHRAE, SMACNA, IPC, UPC, NFPA, HTM etc.)
 Evaluation of work shop drawings according to construction drawings.
 Preparation of shop drawings, as built drawings, material approval, method of statements and
other technical queries.
 Raising technical queries to consultant to resolve conflict between design & project
requirement.
 Co Ordinate with Other Dept in terms of Design Validation.
 Brief knowledge of calculations for HVAC system by using HAP Software (duct sizing, Static
Pressure, Sound Attenuator, Chilled & Heating water pipe Design), Plumbing (Drainage, Storm &
Water Supply) System, Firefighting (Sprinkler, FM200, Deluge & Foam system), Steam &
Condensate system, Fuel system, LPG gas, PTS, Medical gas system, Hydraulic Calculation Etc.
 Provide schedules for air balancing and water balancing, installation, testing and commissioning
of equipment as per projects.
 Managing the work at the project site and coordinating between sub‐ contractors to ensure
execution of all project phases on time.
Technical work duties and responsibility:
 Review tender drawing in co‐ordination with project specification & Boq.
 Supporting bidding department for estimation and study of project drawings.
 Verifying the design as per the standards, if changes required co‐coordinating with consultant
for approval.
 Preparation of Method Statement and material submittal for consultant approval.
 Attending regular meetings with higher management and prepare periodic reports.
 Involve in the selection of mechanical equipment’s such as chillers, AHU, FCU, Splits units,
Package units, Exhaust fans, pumps, heat exchangers/calorifiers, boilers (steam & heating), Air
Separator, Expansion Tanks, Compressors, RO system, STP System and other accessories as per
the project specification.
 Provide quality control and quality assurance to make sure that the purposes of the project are
achieved.
 Finding critical points of construction stages and emphasize to execute it smoothly and in Time.
Site duties and responsibility:
 Supervise all site activities including providing technical inputs for erection and
commissioning of equipment’s, followed by trial runs.
 Day to day co‐ordination with consultants & design required as per site conditions
 Frequently attended meetings in regular basis of all projects and discuss matter of
importance.
 Looking after complete mechanical activities execution till satisfaction of the client.
 Monitoring the site progress to ensure the projects execution activities @ site meet the target
milestones dates as committed

March 2017To Present

Senior Mechanical Design Engineer & Project Coordinator

I found this job using Bayt.com

atSASEL ELECTRO MECHANICAL COMPANY (FEMCO & YUKSEL HOLDING COMPANY)

Location :Saudi Arabia - Eastern Province

MAR2017 TO TILL DATE
PRESENT COMPANY: SASEL ELECTRO MECHANICAL COMPANY (FEMCO & YUKSEL HOLDING COMPANY)

Position Held: Design Manager & Senior Mechanical Engineer

Current Project: King Salman National Guard Specialized Hospital Taif Saudi Arabia.
Client: National Guard Ksa Saudi Arabia.
Consultant: Dar Ul Handsa Consultant Saudi Arabia And Perkins + Wills

SCOPE OF WORK:

MAIN HOSPITAL BUILDING, VILLA’S, APPARTMENTS AND 18 OTHER BUILDINGS

• FAHU’s, AHU'S, HRU, FCU, VAV/CAV, VRV, Package Units, Supply Fans, Exhaust Fan, Refrigerant Piping,
LPG, medical gas & Internal chilled & heating water, Internal steam & condensate pipes networks and
duct (G.I, S.S, D.I, Aluminum & FRP Material) work.
• Fire Fighting (Automatic Sprinklers, Pumps, Deluge, Foam & FM‐200) System, Plumbing (Cold, Soft, Hot,
RO Raw, Dedicated Drinking Water Piping) System, Drainage & Storm Piping system.
• Medical Gas, Pneumatic & LPG System.
UTILITIES BUILDINGS & EXTERNAL WORKS:
• Central Chiller Plant \{Water Cooled Chiller Units with Capacities 420 Tons 9 no's\}.
• Central Boiler Plant with Fuel Fired Steam Boiler 5477 kg/hrs. (2 no's).
• Hot Water Fire Tube Boiler Heating Capacity 1500 KW.
• Calorifier & Heat Exchangers.
• Chilled & Heating Water Network, RTR Pipes, Pre‐Insulated Pipes up to 1000 mm dia.
• Under Ground Steam & Condensate Piping Network & Fuel System.
• Hydraulic (Chilled & Heating), Water Distribution and Fire Fighting (Electric, Diesel & Jockey) Pumps.
• S.T.P with Sewage Lift Station (Sludge Transfer & Submersible Pumps) & Sewage Drain Net Work System and Man Holes (FRP & Concrete).
• Water Treatment Plant (Reverse Osmosis "R. O"), Softeners, UV And Sand Filters.
• Cold water, Soft water, Raw, Potable Water Supply Network, Irrigation (RTR & UPVC) and Fire Fighting
Network (RTR & Ductile).
• Deep well Drilling & Pump, Above Ground Water Storage Tanks (GLS)
• Under Ground Steam & Condensate Piping & Fuel (Diesel & Gasoline) Piping System with Pumps.
• Under Ground Fuel (FRP) & Above Ground Fuel Tank (SS).

JUNE 2015 TO MAR 2017

PRESENT COMPANY: SASEL ELECTRO MECHANICAL COMPANY (FEMCO & YUKSEL HOLDING COMPANY)
Position Held: Senior Mechanical Design Engineer & Project Coordinator

Project: 1
Name: King Fahad Hospital Project Al‐Ahsa Saudi Arabia.
Client: Ministry of Health
Consultant: Dar Engineering’s & Special Consultant Saudi Arabia

Project: 2
Name: Al Jubail General Hospital
Client: Ministry of Health
Consultant: Dar Engineering’s & Special Consultant Saudi Arabia

Project: 3
Name: Qatif Central Hospital with Housing
Client: Ministry of Health
Consultant: Dar Engineering’s & Special Consultant Saudi Arabia

SCOPE OF WORK:
MAIN HOSPITAL BUILDING.
• AHU'S, FCU’s, Exhaust Fan, medical gas & Internal chilled & heating water, Internal steam & condensate
pipes networks and duct work.
• Fire Fighting (Automatic Sprinklers, Pumps & FM‐200) System, Plumbing and Drainage system.
• Medical Gas, Pneumatic & LPG System.
UTILITIES BUILDING & EXTERNAL WORKS:
• Central Chiller Plant Water Cooled Chiller Units with Cooling Tower
• Central Boiler Plant with Fuel Fired Steam Boiler.
• Hot Water Fire Tube Boiler.
• Calorifier & Heat Exchangers.
• Chilled & Heating Water Network, RTR Pipes, Pre‐Insulated Pipes.
• Under Ground Steam & Condensate Piping Network & Fuel System.

Project: 4
Name: King Khalid International Airport Conditional Survey & Tunnel
Client: Gaca ‐ Ksa
Consultant: Gaca - Ksa

March 2011To May 2015

Mechanical Engineer (Design & Site Supervision)

atZUHAIR FAYAZ PARTNERSHIP CONSULTANT KSA

Location :Saudi Arabia - Alahsa

Project: 1
Position Held: Mechanical Engineer (Design &
Site Supervision)
Project Name: King Faisal University Teaching
Hospital Al Ahsa Saudi Arabia.
Client: King Faisal University (Ministry of
Education)
Consultant: Zuhair Fayaz Partnership
Consultant Ksa
Contractors: Al Arab Contracting Company,
Femco & Yuksel

SCOPE OF WORK:

MAIN HOSPITAL BUILDING, OUT PATEINT AND PHYSIOTHERAPY BLDG.
• FAHU’s, AHU'S, HRU, FCU, VAV/CAV, VRV, Package Units, Supply Fans, Exhaust Fan, Refrigerant Piping, LPG, medical gas & Internal chilled & heating water, Internal steam & condensate pipes networks and duct work.
• Fire Fighting (Automatic Sprinklers, Pumps, & FM-200) System, Plumbing (Potable, Non potable, Raw, Hot, RO Raw, Dedicated Drinking Water Piping) System, Drainage & Storm Piping system.
• Medical Gas, Pneumatic System.

UTILITIES BUILDING & EXTERNAL WORKS:
• Central Chiller Plant \{Water Cooled Chiller Units with Capacities 2150 Tons6 no's)\}.
• Central Boiler Plant with Capacities 6800 kg/hrs. (4 no's).
• Chilled & Heating Water Network, RTR Pipes, Pre-Insulated Pipes.
• Calorifier & Heat Exchangers.
• Under Ground Steam & Condensate Piping Network & Fuel System.
• Hydraulic (Chilled & Heating), Water Distribution and Fire Fighting (Electric, Diesel & Jockey) Pumps.
• Sewage Drain Net Work System with Sewage Lift Stations (Submersible Pumps) and Man Holes (FRP).
• Water Treatment Plant (Reverse Osmosis "R. O") With Capacity of 750 cu .m/day.
• Raw, Fire Fighting, Irrigation and Potable Water Supply Networks with Pump rooms (RTR & UPVC).


Project: 2
Position Held: Mechanical Engineer (Design &
Site Supervision)
Project Name: King Faisal University Campus Al
Ahsa Saudi Arabia.
(Admin Bldg., Villas, Pharmacy
Bldg., Utility Bldg., And
Infrastructure Works
Client: King Faisal University (Ministry of
Education)
Consultant: Zuhair Fayaz Partnership
Consultant Ksa
Contractors: Al Arab Contracting Company,
Femco & Yuksel And Al Fouzan
Contracting Co.

SCOPE OF WORK:

ADMIN BLDG., VILLAS, PHARMACY BLDG.
• FAHU’s, AHU'S, FCU, VRV, Package Units, Supply Fans, Exhaust Fan, Refrigerant Piping, & Internal chilled & heating water, duct work.
• Fire Fighting (Automatic Sprinklers, Pumps, & FM-200) System, Plumbing (Potable, Non potable, Raw, Hot, Water Piping) System, Drainage & Storm Piping system.

UTILITIES BUILDING & EXTERNAL WORKS:
• Central Chiller Plant \{Water Cooled Chiller Units with Capacities 3150 Tons 8 no's)\}.
• Chilled & Heating Water Network, RTR Pipes, Pre-Insulated Pipes.
• Calorifiers.
• Hydraulic (Chilled & Heating), Water Distribution and Fire Fighting (Electric, Diesel & Jockey) Pumps.
• Sewage Drain Net Work System with Sewage Lift Stations (Submersible Pumps) and Man Holes (FRP).
• Water Treatment Plant (Reverse Osmosis "R. O") With Capacity of 750 cu .m/day.
• Raw, Fire Fighting, Irrigation and Potable Water Supply Networks with Pump rooms (RTR & UPVC).

March 2009To February 2011

Senior Mechanical Site Engineer

atAIRCON ENGINEER PVT. LTD INDIA

Location :India - Hyderabad

Project: 1
Position Held: Senior Mechanical Site Engineer
Project Name: Infosys Technologies Pvt. Ltd.
Pocharam Hyderabad.
Client: Infosys Technologies Pvt. Ltd.
Consultant: Arco Consultant Pvt.Ltd.
Bangalore
Pmp: Trc World Wide Banglore

Project: 2
Position Held: Mechanical Site Engineer
Project Name: Icici One Source Ltd Bangalore.
Client: Icici One Source Ltd Bangalore.
Consultant: Arco Consultant Pvt.Ltd.
Bangalore

Project: 3
Position Held: Mechanical Site Engineer
Project Name: Infosys Technologies Pvt. Ltd. Chennai (T.N)
Client: Infosys Technologies Pvt. Ltd.
Consultant: Arco Consultant Pvt.Ltd.
Bangalore
Pmp: Trc World Wide Banglore.


SCOPE OF WORK:

OFFICE TOWER BLDGS (G+10).
• AHU'S, FCU, Splits Units Package Units, Supply Fans, Exhaust Fan, Refrigerant Piping & Internal chilled & heating water, duct work.

UTILITIES BUILDING & EXTERNAL WORKS:
• Central Chiller Plant with Cooling Towers.
• Hydraulic (Chilled & Heating), Pumps.

DUTIES AND RESPONSIBILITIES
• Managing the work at the project site and coordinating between sub-contractors to ensure
execution of all project phases on time.
• Supervise all site activities including providing technical inputs for erection and commissioning of Equipment’s, followed by trial runs.
• Adept at supervision, co-ordination and managing the day-to-day and round the clock operations of all specialized services related to project.
• Proficiencies in managing projects with proven abilities in reducing execution time and cost.
• Prepare construction schedules and milestones, and monitor progress against established schedules;
• Prepare the required progress reports and manage the activities of contractors.
• Requisition for supplies of materials to complete works.
• Identifying manpower and equipment needs required for completion of works. Develop and monitor the implementation of quality control programs.
• Reviewing contractors and suppliers’ invoices and submit to the Project Manager for approval. On-going evaluation of construction methods and continuous improvement implementation.
• Reviewing and monitoring the project safety plans and security measures.
• Assist in preparing all progress reports related to the project execution. Manage the work at the project site and coordinate between contractors to ensure execution of all project phases on time.
• Evaluate design changes & coordinate with technical teams for system improvement.
• Monitoring, scheduling and implementation of contract requirement as may deem
necessary for excellent project performance.
• Review design / shop drawings prior to site execution and recommend changes if discrepancy arises.
• To coordinate with sub-contract for the excavation works and arranging over all men and material for the mechanical works.
• Frequently attended meetings in regular basis of all projects and discuss matter of importance.

Sours: https://people.bayt.com/syed-faizan-hussain-18842310/
  1. Baseball sticks
  2. Epic redstone creations
  3. Rugged smartphone cdma

As we are heading to the first quarter of 21st century, there is a growing concern about the environmental impact of various conventional construction activities; in the wake of removal of topsoil for the manufacture of conventional burnt... more

As we are heading to the first quarter of 21st
century, there is a growing concern about the environmental
impact of various conventional construction activities; in the
wake of removal of topsoil for the manufacture of
conventional burnt clay bricks, the FaL-G bricks came into
existence and has played a significant role in reducing the
problem ever since. This paper provides an investigative
insight into the various aspects of replacement of conventional
Burnt-Clay Bricks with Fly ash-Lime-Gypsum (FaL-G) bricks as
a wall construction unit. The main concerns of this
investigation includes the benefits by mitigation of constituent
ingredients from environment through utilization in
manufacture of Fal-G bricks, structural and economical
aspects of replacement of burnt clay bricks by FaL-G bricks,
various ingredients used in the manufacture of FaL-G bricks
and the manufacturing process along with its environment
impact. Such a paper will be fruitful for a construction
industry which proposes to reduce the environmental impacts
by utilization of such products and for the promoted use of
FaL-G bricks.

Issue: 11
Volume: 4
Page Numbers: 1417-1420
Publication Date: 2017
Publication Name: IRJET Journal

Research Interests:

Sustainable Development, Sustainable Materials in Construction, Fly Ash Bricks, and FaL-G bricks

Sours: https://amu-in.academia.edu/SYEDFAIZANHUSAIN
Speak For Hussain 4 Grand Finale: Syed Faizan Hussain Zaidi winning Urdu speech

.

Hussain syed faizan

.

Syed Faizan Hussain Live Nawha Khwani at Hussaini Dalan Imambargah,Dhaka - 6th Muharram,1442H

.

You will also like:

.



294 295 296 297 298